1. Location
30 Km from Ho Chi Minh City, 5 Km from Cu Chi District and 7 Km from Duc Hoa Town.
2. Land area: 200 ha ,
Stage 1 deploy 99,8 ha , include
Cluster A : 12,55 ha Cluster B : 9,03 ha
Cluster C : 23,28 ha Cluster D : 17,96 ha Residents: Not permitted (no resident in the area)
3. Conditions for Land : Payment conditions
Possibility of installment buying 3 times within 01 year
Terms for construction
-
the building – to – land ration : 60% - 70%
-
Density of building : Density of building cannot over 70% to the first storey Density of building cannot over 60% to the second storeys Density of building cannot over 50% to the third storeys
-
Greenbelt ration : at least 20% Regulations on environmental pollution
All the projects locate in SLICO IP qualified to the Environmental Standard of Vietnam.
4. Facilities : Water 1.5 Km from Industrial water factory of IP. It connects to lot by lot. Industrial water utilized without water-purifying device. Supply capacity 3,992 m3/day Possibility of own development of ground water Waste water treatment area of Slico : capacity 3,200m3/day under the government regulations. Electric Distance to transformer substation : under 1Km Voltage : 110/220 KV – 2 x 25 MVA 15 KV – 22 KV
The main electric wire connects to gate of factory. Fire regulations
Fire-engine & Fire station are available in the IP. The each factory should equip the firefighting equipment as regulation of the government Designed services of factories-warehouses : Free of charge
5. Climate : Temperature (annual average) : 26.7oC maximum : 28.7oC (April) minimum : 25.5oC (December)
Humidity (annual average) : 82% Amount of rainfall (annually) : 1,628 mm/year Wind velocity (average) : 1.5 – 2.5 m/s Maximum wind velocity (m/sec): 40m/s
6. Reference for prices : Transportation cost for containers from HCM city ports to SLICO IP 1.300.000 VND/ 20 feet & 1,600,000 VND/ 40 feet Electric unit price : government rate charge 895 VND/Kw Water unit price: 4,000 VND/m3 Salary : Based on Society – Labour and Invalid Ministry, new decree about raising minimum salary for the workforces in FDI areas, location in Long An applied since 01 January 2006 : USD 45/ month.